| Project Description: |
WORCESTER- RECONSTRUCTION OF AIRPORT DRIVE, FROM GODDARD MEMORIAL DRIVE TO ROUTE 122A
The purpose of this project is to reconstruct 4,100 feet of Airport Drive and resurface 1,300 feet along the entrance to the Worcester Regional Airport. Work involves widening to provide shoulders, minor horizontal and vertical geometric improvements, guardrail replacement, pavement markings, signing, and water main installation and drainage improvements.
|
| Location: |
|
| Project Manager: | Vicki Volz![]() |
| Estimated Total Contract Cost: | $2,474,820.99 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|