HOLYOKE- BRIDGE REPLACEMENT, H-21-016, LYMAN STREET OVER SECOND LEVEL CANAL
The work consists of the replacement of the Lyman Street Bridge over the Second Level Canal. The new bridge will be built on the existing alignment. The bridge will be closed to traffic during construction but it will be open for pedestrians crossing. The overall length and width of the bridge will remain unchanged. The project will include roadway work at the approaches to the bridge.
Location:
  • City of Holyoke
  • Resident Engineer: James White
    Construction Contract Value: $5,477,154.00
    Construction Bid Price: $4,877,777.00
    Initial Construction Estimate: $4,349,076.00
    District: District 2

    Contracts (3) Progress
    # 30273 -- Design -- Footprint Bridge contracts
    Statewide Footprint Bridge Round 1 Final
    # 57640 -- Construction Contract
    Bridge Replacement (H-21-016) (Steel) - Lymen Street over the 2nd Level Canal. Completed
    # 58213 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. Final

    Bridges

    Contract Dates
    Notice to Proceed: 03/20/2009
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 02/11/1998
    Project Review Committee PRC Approved 04/14/1998
    Project Review Committee Letter 04/21/1998
    Project Status Advertised 09/20/2008
    Project Status Advertised 12/06/2008
    Project Management
    100% Design 100% Package Received 10/05/2006
    100% Design 100% Package Received 07/09/2007
    100% Design 100% Package Received 07/03/2008
    100% Design 100% Package Comments to DE 11/24/2006
    100% Design 100% Package Comments to DE 12/28/2007
    100% Design 100% Package Comments to DE 08/19/2008
    25% Design 25% Package Received 09/09/2003
    25% Design 25% Package Comments to DE 01/15/2004
    25% Design Design Public Hearing 10/08/2003
    75% Design 75% Package Received 03/06/2006
    75% Design 75% Package Comments to DE 05/17/2006
    Final Design PS&E Received 09/15/2008
    Final Design PS&E to FAPRO 09/16/2008
    Consultant Contract Process NTP Issued 05/14/2001