Project Description: |
ORANGE- CONSTRUCTION OF A CHEMICAL STORAGE SHED AND RELATED WORK AT THE MAINTENANCE DEPOT ON ROUTE 122
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gerald Donnellan |
Estimated Total Federal Participating Construction Cost: | $130,000.00 |
District: | District 2 |
Current Status: | This project has been advertised for construction bids. (as of 04/14/2001 ) |
|
Bridges |
|
|
|