| Project Description: |
CHESHIRE- LANESBOROUGH- CONSTRUCTION OF ASHUWILLTICOOK RECREATION RAIL TRAIL FROM PITTS/LANES TL TO ROUTE 8 (CHEST) (SEGMENT 1)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Federal Participating Construction Cost: | $4,000,000.00 |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 04/15/2000 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||