SPRINGFIELD- BRIDGE BETTERMENT, LONGHILL STREET (NB & SB) AND ROUTE 5 OVER I-91, INCLUDES S-24-049, S-24-050, S-24-051
This project will consists of patching the concrete deck, replace joints, and installing a new wearing surface. It will also address deterioration in the bridge substructures including bridge seats, piers and bearings.
|
| Location: |
|
| Resident Engineer: | Andrew Schiavi![]() |
| Construction Contract Value: | $5,438,117.75 |
| Construction Bid Price: | $3,890,085.00 |
| Initial Construction Estimate: | $2,927,000.00 |
| District: | District 2 |
|