Project Description:
|
PALMER- RECONSTRUCTION & IMPROVEMENTS OF SPRINGFIELD STREET, FROM THE WILBRAHAM T.L. EASTERLY TO BRIDGE STREET
1.25 miles of Springfield Street will be reconstructed. Also included in the project are the signalization of the Main and Bridge Street intersection. Springfield Street will be widened to 33 feet and consists of two 11.5 foot travel lanes and two 5 foot shoulders. A 5 foot cement concrete sidewalk on the south side is proposed for the entire length with an additional 5 foot grass strip proposed, between the curb and sidewalk, along some sections.
The proposed work consists of excavation by cold planer, hot mix asphalt overlay, earth excavation, full depth hot mix asphalt pavement construction, drainage system improvements, hot mix asphalt berm installation, sidewalk and wheelchair ramp construction, granite curb installation, hot mix asphalt and gravel driveway construction, waterline replacement, abandoned track removal, pavement markings, signing, landscaping, and other incidental items necessary to complete the required work.
|