| Project Description: |
HINSDALE- BRIDGE DEMOLITION, BR# H-16-012 BULLARD CROSSING OVER CONRAIL
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Federal Participating Construction Cost: | $509,000.00 |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 03/16/2002 ) |
|
Bridges
|
||||||
|
|
|
|||||||||||||||||