| Project Description: |
RAYNHAM- SIGNAL IMPROVEMENTS @ ROUTE 138 AND ROUTE I-495 RAMPS
This project consists of the final design of traffic signals at the interchange of the I-495 ramp junctions with Route 138 in Raynham, Massachusetts. The ramp junctions at this diamond interchange are currently unsignalized. No geometric changes are anticipated at this time.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Victoria Sheehan![]() |
| Estimated Total Contract Cost: | $953,932.31 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|