| Project Description: |
BROCKTON- SIGNAL UPGRADES AT ROUTE 123 (BELMONT STREET), V.A. HOSPITAL & THE ROUTE 123/MANLEY STREET INTERSECTION
Work on this project includes signal upgrades and geometric improvements at the Route 123 intersection with VA Hospital Drive and with Manley Street. Sidewalk reconstruction, sign and pavement marking installation are also included.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | David Shedd![]() |
| Estimated Total Contract Cost: | $3,002,132.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|