Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
CLINTON- TRAFFIC SIGNALS (4 LOC.), MAIN @ CHURCH ST (1), WATER ST. (RT. 62) (2), BROOK ST (3); WATER @ HIGH STREET (RT. 110) (4)
The work consists of minor roadway widening and pavement overlay and new traffic signals @ Main Street at Church Street (Location 1). This work also includes signal preemption, drainage system modifications, sidewalks and wheelchair ramps, driveway aprons, and granite curbing. Also included in the work is unclassified excavation, cold planing, miscellaneous water system alterations, and the replacement or installation of regulatory, warning, street and guide signing, pavement markings, safety signing for construction operations. This work will also include the installation of an emergency preemption system and new traffic signals, pedestrian signals and new wheelchair ramps at the following three (3) intersections: Location 2: Main Street at Water Street/Sterling Street Location 3: Main Street at Brook Street Location 4: Water Street at High Street
Location:
  • Town of Clinton
  • Project Manager: Ranjit Sivasubramaniam
    Estimated Total Contract Cost: $1,230,317.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project