CLINTON- TRAFFIC SIGNALS (4 LOC.), MAIN @ CHURCH ST (1), WATER ST. (RT. 62) (2), BROOK ST (3); WATER @ HIGH STREET (RT. 110) (4)
The work consists of minor roadway widening and pavement overlay and new traffic signals @ Main Street at Church Street (Location 1). This work also includes signal preemption, drainage system modifications, sidewalks and wheelchair ramps, driveway aprons, and granite curbing. Also included in the work is unclassified excavation, cold planing, miscellaneous water system alterations, and the replacement or installation of regulatory, warning, street and guide signing, pavement markings, safety signing for construction operations. This work will also include the installation of an emergency preemption system and new traffic signals, pedestrian signals and new wheelchair ramps at the following three (3) intersections: Location 2: Main Street at Water Street/Sterling Street Location 3: Main Street at Brook Street Location 4: Water Street at High Street
Location:
  • Town of Clinton
  • Resident Engineer: -- not assigned --
    Construction Contract Value: $1,230,317.00
    Construction Bid Price: $948,925.00
    Initial Construction Estimate: $781,450.50
    District: District 3
    Current Status: Project is completed. Final traffic signal operation inspection is anticipated. (as of 08/25/2006)

    Contracts (1) Progress
    # 37930 -- Construction Contract
    Clinton - Traffic Signal Installation and Modifications at Four Locations. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/07/2005
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Project is completed. Final traffic signal operation inspection is anticipated.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 04/06/1998
    Project Review Committee PRC Approved 04/14/2003
    Project Status Advertised 09/18/2004
    Project Management
    Final Design PS&E Received 03/16/2004
    Final Design PS&E to FAPRO 03/16/2004