Project Description:
|
GARDNER- RESURFACING, GREEN STREET FROM MATTHEWS STREET NORTHERLY TO ROUTE 140
The proposed project consists of resurfacing Green Street from the intersection with Stone Street to a point 1,500 feet north of Matthews Street, a total distance of approximately 4,250 feet. The work will include full-depth roadway widening and resurfacing, sidewalk construction, drainage structure and water gate adjustment, installing bituminous and granite curb, removing and resetting granite curb, placing pavement markings and instituting traffic control operations during construction.
|