Project Description:
CONCORD- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2 INCLUDING MEDIAN BARRIER
The work consists of resurfacing the existing pavement and replacing the existing median barrier with a higher median barrier for safety purposes. Also included is the construction of retaining walls and wildlife box culverts and utility line relocation. The project extends from just west of the Concord/Lincoln town line to Route 126 and then from Sudbury Road in Concord to Nine Acre Corner in Concord. This project is 1.15 miles long.
Location:
  • Town of Concord
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Albert Li
    Estimated Total Contract Cost: $6,779,017.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • C19021 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project