CONCORD- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2 INCLUDING MEDIAN BARRIER
The work consists of resurfacing the existing pavement and replacing the existing median barrier with a higher median barrier for safety purposes. Also included is the construction of retaining walls and wildlife box culverts and utility line relocation. The project extends from just west of the Concord/Lincoln town line to Route 126 and then from Sudbury Road in Concord to Nine Acre Corner in Concord. This project is 1.15 miles long.
|