Project Description: |
FOXBOROUGH- TRAFFIC SAFETY IMPROVEMENTS, MECHANIC STREET AT OAK STREET
The work to be done at this intersection includes modifications to the existing drainage system, full depth roadway reconstruction, and the construction of cement concrete sidewalks and wheelchair ramps along with granite curbing, replacement of traffic signal system, signs and pavement markings.
|
Location: |
|
Resident Engineer: | Michael Giovanelli |
Construction Contract Value: | $1,077,765.02 |
Construction Bid Price: | $833,140.02 |
Initial Construction Estimate: | $800,690.75 |
District: | District 5 |
|