| Project Description: |
DISTRICT 4- HIGHWAY LIGHTING UPGRADES AT VARIOUS LOCATIONS
The intent of this project is to upgrade highway lighting as assigned within the limits of District 4. The work to be done under this contract shall consist of furnishing all necessary materials, labor and equipment to upgrade and/or maintain in satisfactory operating condition.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Peter Kutrubes![]() |
| Estimated Total Federal Participating Construction Cost: | $600,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 01/27/2001 ) |
|