Project Description:
TOPSFIELD- RECONSTRUCTION OF IPSWICH ROAD, FROM MAIN STREET TO ROUTE 1 (APPROX. 1/3 KM)
The proposed project consists of the reconstruction Ipswich Road from Main Street extending easterly to Route 1 for a distance of approximately 1300 meters. The proposed project shall include pavement reconstruction with new sidewalks with ADA conforming wheelchair ramps, and granite curb on the north side of Ipswich Road. Hot mix asphalt berm is proposed for the south side of the roadway. Also included are drainage improvements, traffic signing, pavement markings, and other incidental work.
Location:
  • Town of Topsfield
  • Resident Engineer: William Murphy
    Construction Contract Value: $3,140,002.66
    Construction Bid Price: $3,664,666.54
    Initial Construction Estimate: $4,386,677.00
    District: District 4

    Contracts (1) Progress
    # 57207 -- Construction Contract
    Topsfield - Roadway Reconstruction and Related Work on a Section of Ipswich Road Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/28/2009
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 07/14/1998
    Project Review Committee PRC Approved 10/20/1998
    Project Status Advertised 08/30/2008
    Project Management
    100% Design 100% Package Received 04/25/2008
    100% Design 100% Package Comments to DE 08/01/2008
    25% Design 25% Package Received 10/21/2002
    25% Design 25% Package Comments to DE 03/23/2003
    25% Design Design Public Hearing 03/23/2004
    75% Design 75% Package Received 03/01/2005
    75% Design 75% Package Comments to DE 11/21/2005
    Final Design PS&E Received 08/25/2008
    Final Design PS&E to FAPRO 08/26/2008