Project Description: |
DEERFIELD- CULVERT INSTALLATION AND RELATED WORK ON SECTIONS OF ROUTE 5 AND 10
The work consists of culvert construction and slope repair on Routes 5 & 10. Incidental other work includes drainage structures, tree removal, highway guardrail, roadway reconstruction to include paving, siltation control and safety controls.
|
Location: |
|
Resident Engineer: | John Marotte |
Construction Contract Value: | $149,586.00 |
Construction Bid Price: | $86,586.00 |
Initial Construction Estimate: | $66,000.00 |
District: | District 2 |
Current Status: | Physical work complete (as of 01/11/2005) |
|
Bridges |
|
|
|
|