CHARLEMONT- BRIDGE REPLACEMENT, BR# C-05-049 BURRINGTON ROAD OVER HARTWELL BROOK
This project will result in the replacement of the structurally deficient Burrington Road Bridge over Hartwell Brook with a new bridge and associated improvements. The new bridge will be approximately 20.5 feet wide and 36 feet long and consist of precast concrete frame on piles with Texas-style safety rails. The grade of the bridge approaches will be improved along with new pavement on the roadway approaches, extending approximately 60 feet, along with new bridge guardrails. New bridge wing walls will be constructed and the slopes protected with riprap.
Location:
  • Town of Charlemont
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Shawn Holland
    Estimated Total Contract Cost: $552,467.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • C05049 
    See the Milestone Details tab for additional Project information