Project Description: |
LYNNFIELD- WAKEFIELD- NOISE BARRIER CONSTRUCTION ON THE SOUTH SIDE OF ROUTE I-95 BETWEEN INTERCHANGES 41 AND 42
LYNNFIELD- WAKEFIELD- NOISE BARRIER CONSTRUCTION ON THE SOUTH SIDE OF ROUTE I-95 BETWEEN INTERCHANGES 41 AND 42
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | |
Estimated Total Federal Participating Construction Cost: | $2,494,724.00 |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 10/07/2000 ) |
|
Bridges |
|
|
|