Project Description: |
BELCHERTOWN- BRIDGE REPLACEMENT, BR# B-05-027, ROUTE 9 OVER SWIFT RIVER
This project will result in the demolition of the existing bridge and substructure. Along with the construction of a new bridge, the approach roadways will be reconstructed, retaining walls will be constructed and guardrail, pavement markings, temporary traffic signals, and other incidental work be provided.
|
Location: |
|
Resident Engineer: | Jane Trudeau |
Construction Contract Value: | $2,103,394.00 |
Construction Bid Price: | $1,867,631.50 |
Initial Construction Estimate: | $1,513,380.00 |
District: | District 2 |
Current Status: | Both lanes opened to traffic (as of 06/15/2007) |
|
Bridges
|
|
|
|
|