SOUTHAMPTON- BRIDGE REPLACEMENT, BR# S-19-009 ROUTE 10 (COLLEGE HIGHWAY) OVER MANHAN RIVER
The work consists of repairing the substructure and replacing the existing bridge deck structure with a single span reinforced concrete bridge structure in approximately the same location. The work also includes reconstructing the approach roadways and adjacent traffic signal. Incidental items of work include clearing and grubbing, demolition, drainage adjustments, new pavement, curb, sidewalks with wheelchair ramps, temporary traffic signals, and traffic safety controls.
Location:
  • Town of Southampton
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Joseph Mombrun
    Estimated Total Contract Cost: $1,639,596.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • S19009 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project