Project Description:
|
SOUTHAMPTON- BRIDGE REPLACEMENT, BR# S-19-009 ROUTE 10 (COLLEGE HIGHWAY) OVER MANHAN RIVER
The work consists of repairing the substructure and replacing the existing bridge deck structure with a single span reinforced concrete bridge structure in approximately the same location. The work also includes reconstructing the approach roadways and adjacent traffic signal. Incidental items of work include clearing and grubbing, demolition, drainage adjustments, new pavement, curb, sidewalks with wheelchair ramps, temporary traffic signals, and traffic safety controls.
|