Project Description: |
NEW MARLBOROUGH- BRIDGE REPLACEMENT, N-08-013, MILL RIVER ROAD OVER THE KONKAPOT RIVER
This project involves rehabilitating the Mill River Road Bridge with a new bridge deck on the existing bridge abutments, which are to be repaired. The new bridge will be widened by approximately 3.3 feet. The bridge is proposed to remain open during staged construction.
|
Location: |
|
Resident Engineer: | Joseph Mastroianni![]() |
Construction Contract Value: | $1,330,038.79 |
Construction Bid Price: | $1,220,212.10 |
Initial Construction Estimate: | $1,122,013.12 |
District: | District 1 |
|