Project Description: |
BROOKLINE- FRAMINGHAM- NATICK- NEWTON- SOUTHBOROUGH- WELLESLEY- WESTBOROUGH- TRAFFIC SIGNS ON ROUTE 9
This project will replace and update all overhead and ground-mounted guide sign panels, exit gore, warning, regulatory, and route marker panels on Route 9 and secondary roadways from the Boston-Brookline town line to I-495 in Westborough, with the exception of signing which was updated under the I-495 Milford to Bolton contract.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Stephen Timmins![]() |
Estimated Total Contract Cost: | $2,502,082.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|