Project Description:
LENOX- RECONSTRUCTION ON ROUTE 183 (WEST STREET) ROUTE 7A & 183 STOCKBRIDGE/LENOX T.L. INCLUDES CULVERT REPAIR OF L-07-008
The project will reconstruct a section of Route 183 from the intersection of Route 7A westerly for 2.5 miles to the Lenox/Stockbridge townline. The proposed work includes reclaiming the existing pavement, installing curbing, upgrading drainage, and constructing an 8 foot wide handicap accessible multi-use path along one side of the roadway.
Location:
  • Town of Lenox
  • Resident Engineer: Christopher Dindio
    Construction Contract Value: $5,326,328.00
    Construction Bid Price: $4,327,916.60
    Initial Construction Estimate: $5,239,151.00
    District: District 1

    Contracts (1) Progress
    # 65443 -- Construction Contract
    Roadway Reconstruction and Related Work on a Section of West Street (Route 183). (ARRA Project) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 09/01/2010
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 04/02/1999
    Project Review Committee PRC Tabled 05/24/1999
    Project Review Committee PRC Approved 09/27/1999
    Project Status Advertised 06/19/2010
    Project Management
    100% Design 100% Package Received 10/26/2009
    100% Design 100% Package Comments to DE 12/04/2009
    25% Design 25% Package Received 06/15/2006
    25% Design 25% Package Received 11/14/2008
    25% Design 25% Package Comments to DE 12/08/2006
    25% Design Design Public Hearing 06/22/2009
    75% Design 75% Package Received 08/14/2009
    75% Design 75% Package Comments to DE 09/08/2009
    Final Design PS&E Received 02/16/2010
    Final Design PS&E to FAPRO 06/02/2010
    Final Design PS&E to FAPRO 06/09/2010