Project Description: |
LENOX- RECONSTRUCTION ON ROUTE 183 (WEST STREET) ROUTE 7A & 183 STOCKBRIDGE/LENOX T.L. INCLUDES CULVERT REPAIR OF L-07-008
The project will reconstruct a section of Route 183 from the intersection of Route 7A westerly for 2.5 miles to the Lenox/Stockbridge townline. The proposed work includes reclaiming the existing pavement, installing curbing, upgrading drainage, and constructing an 8 foot wide handicap accessible multi-use path along one side of the roadway.
|
Location: |
|
Resident Engineer: | Christopher Dindio |
Construction Contract Value: | $5,326,328.00 |
Construction Bid Price: | $4,327,916.60 |
Initial Construction Estimate: | $5,239,151.00 |
District: | District 1 |
|