Project Description:
MONTAGUE- CONSTRUCTION OF THE FRANKLIN COUNTY BIKEWAY (PHASE I)
The Franklin County Bikeway Phase I project will result in the construction of a new bituminous concrete bikepath to carry bicycle and pedestrian traffic in the Town of Montague. This phase begins at Montague City Road as a shared road facility and continues north onto Depot Street. At Depot Street it connects to an existing abandoned railroad right-of-way and becomes an off-road facility terminating at Unity Park. The total length of this project is approximately 4000 meters.
Location:
  • Town of Montague
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Philip Macdonald
    Estimated Total Contract Cost: $1,524,876.38
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information