SPENCER- BRIDGE REPLACEMENT, S-23-016, BROOKS POND ROAD OVER FIVE MILE RIVER
The purpose of this project is to replace the existing bridge. The concrete spillway will remain as will part of the existing abutments. The new bridge will be built behind the existing abutments to reduce environmental impacts.
Location:
  • Town of Spencer
  • Resident Engineer: Paul Thompson
    Construction Contract Value: $1,179,777.41
    Construction Bid Price: $636,461.00
    Initial Construction Estimate: $415,562.00
    District: District 3

    Contracts (3) Progress
    # 54619 -- Design -- Geotechnical
    Work will consist of laboratory and field testing, subsurface investigation inspection and design and analysis of complex foundation rehabilitation projects. Final
    # 55859 -- Design -- Hwy Eng Open End
    Work will consist of providing services on an open end basis for various projects which require Chapter 253 Dam Safety Permit Review and Completion. Final
    # 67817 -- Construction Contract
    Bridge Replacement - Brooks Pond Road over the Five Mile River Completed

    Bridges

    Contract Dates
    Notice to Proceed: 04/29/2011
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 06/30/1999
    Project Review Committee PRC Approved 09/27/1999
    Project Status Advertised 09/25/2004
    Project Status Advertised 09/11/2010
    Project Management
    100% Design 100% Package Received 06/02/2004
    100% Design 100% Package Received 05/18/2010
    100% Design 100% Package Comments to DE 06/25/2010
    25% Design 25% Package Received 05/30/2001
    25% Design 25% Package Approved 06/22/2001
    25% Design Design Public Hearing 08/31/2009
    75% Design 75% Package Received 07/03/2002
    Final Design PS&E Received 07/16/2009
    Final Design PS&E Received 08/24/2010
    Final Design PS&E Received 11/15/2010
    Final Design PS&E to FAPRO 08/28/2004
    Final Design PS&E to FAPRO 09/07/2010