| Project Description: |
WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA
The purpose of this project is to replace the existing bridge carrying Salem Street over the MBTA railroad tracks on a new alignment to allow for staged construction. One lane of the existing bridge will remain open during construction due to high traffic volumes.
|
| Location: |
|
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Violet Wilkins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|