Project Description:
WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA
The purpose of this project is to replace the existing bridge carrying Salem Street over the MBTA railroad tracks on a new alignment to allow for staged construction. One lane of the existing bridge will remain open during construction due to high traffic volumes.
Location:
  • City of Woburn
  • Right of Way Responsibility: MassDOT
    Project Manager: Violet Wilkins
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • W43003 
    See the Milestone Details tab for additional Project information