Project Description: |
WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA
The purpose of this project is to replace the existing bridge carrying Salem Street over the MBTA railroad tracks on a new alignment to allow for staged construction. One lane of the existing bridge will remain open during construction due to high traffic volumes.
|
Location: |
|
Construction Begins: | Spring 2017 |
Resident Engineer: | James Gruttner |
Construction Bid Price: | $4,319,006.75 |
District: | District 4 |
|
Bridges
|
|
|
|
|