Project Description: |
FALL RIVER- INSTALLATION OF A PRE-ACTION SPRINKLER SYSTEM AND A CARBON MONOXIDE MONITORING SYSTEM AT GOVERNMENT CENTER PLAZA
The work consists of furnishing all required equipment, labor and materials for the installation of a pre-action sprinkler system at the basement of the Fall River City Hall, and a carbon monoxide monitoring system at the Fall River City Hall Building.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Michael Papadopoulos |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 02/03/2001 ) |
|