FALL RIVER- INSTALLATION OF A PRE-ACTION SPRINKLER SYSTEM AND A CARBON MONOXIDE MONITORING SYSTEM AT GOVERNMENT CENTER PLAZA
The work consists of furnishing all required equipment, labor and materials for the installation of a pre-action sprinkler system at the basement of the Fall River City Hall, and a carbon monoxide monitoring system at the Fall River City Hall Building.
Location:
  • City of Fall River
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Michael Papadopoulos
    Estimated Total Contract Cost: $118,000.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • F02099 
    See the Milestone Details tab for additional Project information