| Project Description: |
FALL RIVER- INSTALLATION OF A PRE-ACTION SPRINKLER SYSTEM AND A CARBON MONOXIDE MONITORING SYSTEM AT GOVERNMENT CENTER PLAZA
The work consists of furnishing all required equipment, labor and materials for the installation of a pre-action sprinkler system at the basement of the Fall River City Hall, and a carbon monoxide monitoring system at the Fall River City Hall Building.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Michael Papadopoulos![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project has been advertised for construction bids. (as of 02/03/2001 ) |
|