WILLIAMSTOWN- RETAINING WALL REPLACEMENT & RELATED WORK ON ROUTE 2
The proposed project consists of replacing of a deteriorated concrete retaining wall on Route 2 in Williamstown. The project extends approximately 430 feet along Route 2 and is located about 1/3 of a mile west of its intersection with Route 7. A “vegetated prefabricated concrete bin-retaining wall” system is being proposed. A new paved swale and drainage structure will be constructed along the front of the new retaining wall and the existing pavement within the project limits will be replaced.
|