Project Description:
WILLIAMSTOWN- RETAINING WALL REPLACEMENT & RELATED WORK ON ROUTE 2
The proposed project consists of replacing of a deteriorated concrete retaining wall on Route 2 in Williamstown. The project extends approximately 430 feet along Route 2 and is located about 1/3 of a mile west of its intersection with Route 7. A “vegetated prefabricated concrete bin-retaining wall” system is being proposed. A new paved swale and drainage structure will be constructed along the front of the new retaining wall and the existing pavement within the project limits will be replaced.
Location:
  • Town of Williamstown
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Shahpar Negah
    Estimated Total Contract Cost: $1,899,977.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information