Project Description: |
FRANKLIN- CONCRETE ROADWAY AND FROST HEAVE REPAIR ON ROUTE I-495 (REPAIRS TO CONCRETE ROADWAY JOINTS)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | John Gendall |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 09/23/2000 ) |
|
Bridges |
|
|
|