Project Description: |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA A (3 SEPARATE CONTRACTS)
The work to be done under this contract consists of the installation of drainage pipes and structures, rebuilding of drainage structures, cleaning of waterways, drainage ditches, drainage structures and pipes in Area 5A.
|
Location: | |
Project Manager: | John Gendall |
Estimated Total Contract Cost: | $807,183.49 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|