| Project Description: |
EASTHAMPTON- CONSTRUCTION OF MANHAN TRAIL (PHASE II) ALONG ABANDONED MANHAN RAILROAD LINE FROM SOUTH STREET TO ROUTE 5
This project will result in the construction of a multi-purpose trail along approximately 5.2 miles of former rail line from Coleman Road to Route 5. Phase I of the project was the removal of existing railroad ties and site clearing/grubbing. Phase II is the actual construction of the trail.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Shawn Holland![]() |
| Estimated Total Federal Participating Construction Cost: | $500,000.00 |
| District: | District 2 |
| Current Status: | This project has been advertised for construction bids. (as of 08/10/2002 ) |
|