Project Description:
EASTHAMPTON- CONSTRUCTION OF MANHAN TRAIL (PHASE II) ALONG ABANDONED MANHAN RAILROAD LINE FROM SOUTH STREET TO ROUTE 5
This project will result in the construction of a multi-purpose trail along approximately 5.2 miles of former rail line from Coleman Road to Route 5. Phase I of the project was the removal of existing railroad ties and site clearing/grubbing. Phase II is the actual construction of the trail.
Location:
  • Town of Easthampton
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Shawn Holland
    Estimated Total Contract Cost: $715,103.50
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • E05012 
    • E05029 
    • E05030 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project