Project Description: |
EASTHAMPTON- CONSTRUCTION OF MANHAN TRAIL (PHASE II) ALONG ABANDONED MANHAN RAILROAD LINE FROM SOUTH STREET TO ROUTE 5
This project will result in the construction of a multi-purpose trail along approximately 5.2 miles of former rail line from Coleman Road to Route 5. Phase I of the project was the removal of existing railroad ties and site clearing/grubbing. Phase II is the actual construction of the trail.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Shawn Holland![]() |
Estimated Total Contract Cost: | $715,103.50 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|