Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
NEWBURY- BRIDGE REPLACEMENT, N-10-010, ROUTE 1A (HIGH ROAD) OVER THE PARKER RIVER
The proposed project will replace the existing bridge in its present location with improvements to the approach roadway. The original design entailed providing one lane of traffic in each direction and a sidewalk during the construction. Based on additional deterioration discovered when the project first commenced, the design was modified to utilize single stage construction with the bridge being closed and all traffic detoured. The formal, signed detour route utilizes Route 133, Route 1 and Hanover Street.
Location:
  • Town of Newbury
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Gautam Sen
    Estimated Total Contract Cost: $14,125,670.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • N10010 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project