Project Description: |
CONCORD- LINCOLN- BRIDGE REPLACEMENT, BR# C-19-005 = L-12-003 ROUTE 117 OVER SUDBURY RIVER (LEE'S BRIDGE)
The work consists of replacing the existing bridge structure carrying Route 117 over the Sudbury River and includes the construction and subsequent removal of a temporary roadway and bridge.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gautam Sen![]() |
Estimated Total Contract Cost: | $7,938,382.63 |
Estimated Total Federal Participating Construction Cost: | $2,000,000.00 |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 08/10/2002 ) |
|