Project Description: |
CONCORD- LINCOLN- BRIDGE REPLACEMENT, BR# C-19-005 = L-12-003 ROUTE 117 OVER SUDBURY RIVER (LEE'S BRIDGE)
The work consists of replacing the existing bridge structure carrying Route 117 over the Sudbury River and includes the construction and subsequent removal of a temporary roadway and bridge.
|
Location: |
|
Resident Engineer: | Jay Patel |
Construction Contract Value: | $7,938,382.63 |
Construction Bid Price: | $6,426,427.50 |
Initial Construction Estimate: | $6,968,000.00 |
District: | District 4 |
Current Status: | Project is substantially complete. (as of 01/15/2009) |
|