| Project Description: |
CHICOPEE- GREENFIELD- SLOPE REPAIRS AND STABILIZATION ON ROUTE 33 AND INTERSTATE 91
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | John Gendall![]() |
| Estimated Total Contract Cost: | $232,727.49 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||