| Project Description: |
DISTRICT 3- SCHEDULED AND EMERGENCY INSTALLATION OF BRIDGE SHIELDING SYSTEMS AT VARIOUS LOCATIONS (5 SEPARATE CONTRACTS)
The work consists of furnishing and installing bridge shielding at various locations. The work to be performed shall consist of furnishing all materials, equipment, labor and traffic control to perform the necessary work.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $504,650.00 |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 07/14/2001 ) |
|