| Project Description: |
BEVERLY- DANVERS- GLOUCESTER- MANCHESTER- PEABODY- WENHAM- TRAFFIC SIGNS UPGRADE PROJECT ON ROUTE 128
The project will replace and update all overhead and ground-mounted guide sign panels, exit gore, warning, regulatory, and route marker panels on Route 128 and secondary roadways from Route 114 in Peabody to Blackburn Circle in Gloucester, with the exception of a stretch from Andover St. to Eliot St., where there is another project currently under design.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Brian Chapman![]() |
| Estimated Total Contract Cost: | $2,228,384.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|