Project Description: |
MONTAGUE- BRIDGE REPLACEMENT, M-28-028, PROSPECT STREET OVER SPRING STREET
The purpose of this project is to replace the Prospect Street bridge over Spring Street. The new bridge will be a single concrete span on concrete abutments. The curb to curb width will be 23 feet with a 6 foot sidewalk. The bridge will be closed during construction.
|
Location: |
|
Resident Engineer: | Sean Burke |
Construction Contract Value: | $2,468,674.00 |
Construction Bid Price: | $2,213,004.00 |
Initial Construction Estimate: | $2,676,658.00 |
District: | District 2 |
|