STERLING- BRIDGE REPLACEMENT, S-25-008, MUDDY POND ROAD OVER THE STILLWATER RIVER
This town-owned, structurally deficient will be replaced with a new bridge that will be six feet wider with a sidewalk along one side. The new bridge will consist of a single span constructed upon the existing bridge abutments. The bridge will be closed for construction and traffic detoured.
Location:
  • Town of Sterling
  • Resident Engineer: Lisa Spezzaferro-Pelleti
    Construction Contract Value: $1,215,140.00
    Construction Bid Price: $1,049,037.00
    Initial Construction Estimate: $808,829.30
    District: District 3
    Current Status: MassHighway moved this work to a new contractor. Work on this project has resumed. (as of 07/20/2007)

    Contracts (1) Progress
    # 45642 -- Construction Contract
    Sterling - Bridge Replacement - (S-24-008) (Concrete) - Muddy Pond Road over the Stillwater River Completed

    Bridges

    Contract Dates
    Notice to Proceed: 08/24/2006
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    MassHighway moved this work to a new contractor. Work on this project has resumed.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 02/23/2000
    Project Review Committee PRC Approved 12/19/2000
    Project Status Advertised 12/03/2005
    Project Management
    100% Design 100% Package Received 09/07/2005
    25% Design 25% Package Received 05/14/2004
    25% Design 25% Package Comments to DE 08/09/2004
    25% Design Design Public Hearing 01/25/2005
    75% Design 75% Package Received 05/12/2005
    75% Design 75% Package Comments to DE 06/15/2005
    Final Design PS&E Received 10/21/2005
    Final Design PS&E to FAPRO 11/23/2005