| Project Description: |
LYNNFIELD- INSTALLATION OF A ROADWAY LIGHTING SYSTEM AT GOODWIN CIRCLE
The project consists of the placement of roadway lighting and controls. The project will include the installation of approximately 14 Street Lights located approximately 5 feet from the edge of roadway. All trenching and conduit will be located as close to the roadway as possible.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ranjit Sivasubramaniam![]() |
| Estimated Total Contract Cost: | $278,981.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 02/11/2006 ) |
|