Project Description: |
LYNNFIELD- INSTALLATION OF A ROADWAY LIGHTING SYSTEM AT GOODWIN CIRCLE
The project consists of the placement of roadway lighting and controls. The project will include the installation of approximately 14 Street Lights located approximately 5 feet from the edge of roadway. All trenching and conduit will be located as close to the roadway as possible.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Ranjit Sivasubramaniam![]() |
Estimated Total Contract Cost: | $278,981.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|