| Project Description: |
DISTRICT 4- ASBESTOS ABATEMENT AND DISPOSAL AT THE DISTRICT MAINTENANCE FACILITIES DISTRICT WIDE (2 SEPARATE CONTRACTS)
The project involves removing, and properly disposing of, asbestos containing material from Department facilities where renovation and demolition activities are scheduled. The work will be performed in accordance with MassHighway’s Asbestos Operation & Maintenance Plan by a certified asbestos abatement contractor with oversight by third-party asbestos inspector.
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Robert Johnson![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 12/15/2001 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||