| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS (DISTRICT WIDE)
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project has been advertised for construction bids. (as of 05/20/2000 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||