DEDHAM- NEEDHAM- BRIDGE REPLACEMENT ON ROUTE 128 (ADD-A-LANE BRIDGES) D-05-042, D-05-043, D-05-040, D-05-041, D-05-038=N-04-030, D-05-039, N-04-029 (BRIDGE IV)
The work consists of the replacement of the Route 109, 135, Charles River, and Great Plain Avenue bridges. The roadway work will consist of adding a new 12-foot travel lane and 10-foot shoulder toward the median in both directions. The limits will begin from just south of Route 109 structures in Dedham and extend to just north of the Needham railroad line in Needham. The total length of project is approximately 4.0 miles of I-95/Route 128 roadway. A noise barrier will be constructed along Roberts Road. The work will also include retaining wall construction and drainage improvements addressing the latest stormwater management standards.
Location:
  • Town of Dedham
  • Town of Needham
  • Resident Engineer: Thomas Akins
    Construction Contract Value: $89,109,736.00
    Construction Bid Price: $76,667,033.00
    Initial Construction Estimate: $99,723,675.00
    District: District 4

    Contracts (8) Progress
    # 54821 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 57463 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 62861 -- Construction Contract
    Route 128/95 ADD-A-LANE Roadway Reconstruction and Replacement of 7 Bridges. Completed
    # 62936 -- Non-system contract type
    Statewide-Owner's Representative-Will perform peer reviews and manage cost recovery and value engineering on various projects.
    # 64302 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 64308 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 64322 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 76262 -- Non-system contract type
    Perform various assignments as the Owner's Representative for the peer review of engineering elements associated with satewide construction projects.

    Bridges

    Contract Dates
    Notice to Proceed: 05/26/2010
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 05/17/2000
    Project Review Committee PRC Approved 06/26/2001
    Project Status Advertised 09/19/2009
    Project Management
    100% Design 100% Package Received 06/03/2009
    100% Design 100% Package Comments to DE 09/02/2009
    25% Design 25% Package Received 01/07/2005
    25% Design 25% Package Comments to DE 10/27/2008
    25% Design Design Public Hearing 09/21/2005
    75% Design 75% Package Received 03/03/2006
    75% Design 75% Package Received 09/12/2008
    75% Design 75% Package Comments to DE 12/04/2008
    Final Design PS&E Received 09/04/2009
    Final Design PS&E Received 10/30/2009
    Final Design PS&E to FAPRO 09/04/2009
    Final Design PS&E to FAPRO 09/10/2009
    Consultant Contract Process Scope to DE 09/18/2001
    Consultant Contract Process NTP Issued 07/31/2003
    Consultant Contract Process Workhours Approved 12/31/2002