| Project Description: |
SOUTHWICK- INSTALLATION OF TRAFFIC CONTROL SYSTEM, ROUTE 57 (FEEDING HILLS ROAD) AT FOSTER ROAD AND NORTH LANGYARD ROAD
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Filbert Yee![]() |
| Estimated Total Contract Cost: | $141,496.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||