Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
FALL RIVER- SOMERSET- SWANSEA- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195
This project will resurface various sections of I-195 including ramps and some bridge approaches located in Fall River, Somerset and Swansea. Additional work (as needed) includes various drainage work, edging/curb replacement or resetting, application of temporary and permanent pavement markings, and other related work incidental to a project of this nature.
Location:
  • City of Fall River
  • Town of Somerset
  • Town of Swansea
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Brian Haggerty
    Estimated Total Contract Cost: $1,374,584.40
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project