HOLYOKE- CANAL WALK EXTENSION (2ND LEVEL CANAL), FROM APPLETON STREET TO DWIGHT STREET (PHASE II), INCLUDES REHAB OF H-21-062
This project is the second phase of a 9000 foot pedestrian walkway in the historic canal area beginning at Holyoke Heritage State Park. This section focuses on the 2nd Level Canal at Race Street from Appleton Street to Dwight Street. It includes acquiring the right of way then demolishing and rebuilding a loading dock and another structure at another location. Sidewalks will be reconstructed on Appleton and Dwight Streets to provide a connection to Phase 1. The Abandoned RR over 2nd level canal (H-21-062) will be rehabilitated for pedestrian use. This bridge work will mainly involve the deck and railings, and minor repairs to the bridge piers. The total length of the project is approximately 3,000 feet (0.57 miles).
Location:
  • City of Holyoke
  • Resident Engineer: Daniel Kaminski
    Construction Contract Value: $3,935,095.73
    Construction Bid Price: $3,550,166.00
    Initial Construction Estimate: $3,442,533.50
    District: District 2

    Contracts (3) Progress
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 73478 -- Design -- Bridge Open End
    Work will consist of inspection of MassDOT owned Dams and Spillway structures and the design of repairs and/or rehabilitation of the dams and spillway structures. Final
    # 79739 -- Construction Contract
    Construction of a Section of the 2nd Level Canal Walk Extension (Including Rehabilitation of Bridge (H-21-062)) Phase II. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 04/22/2014
    Contract Information
    Project Designer: Municipality
    Funding Source: HIGH PRIORITY PROJECTS
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 09/18/2008
    Project Review Committee PRC Approved 11/06/2008
    Project Review Committee PRC Denied 06/22/2004
    Project Review Committee Letter 11/18/2008
    Project Status Approved 25% 04/15/2009
    Project Status Initiated 10/26/2005
    Project Status Advertised 09/14/2013
    Project Management
    100% Design 100% Package Received 02/01/2013
    100% Design 100% Package Comments to DE 05/29/2013
    25% Design 25% Package Received 11/07/2011
    25% Design 25% Package Received 04/26/2012
    25% Design 25% Package Comments to DE 04/02/2012
    25% Design Design Public Hearing 07/11/2012
    75% Design 75% Package Received 10/23/2012
    75% Design 75% Package Comments to DE 01/02/2013
    Final Design PS&E Received 08/14/2013
    Final Design PS&E to FAPRO 09/09/2013