| Project Description: |
BELCHERTOWN- BRIDGE BETTERMENT, BR# B-05-007, MILL VALLEY ROAD (ROUTE 181) OVER JABISH BROOK
This project involves replacing the structurally deficient Mill Valley Road Bridge where it crosses over Jabish Brook. A temporary bridge will be constructed adjacent to the existing bridge so access can be maintained while the new bridge is constructed.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Bruce Sylvia![]() |
| Estimated Total Contract Cost: | $397,645.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||