Project Description: |
MILLIS- BRIDGE REHABILITATION, BR# M-23-014 ORCHARD STREET OVER BOGASTOW BROOK
The Orchard Street Bridge over Bogastow River is a historical stone arch. The purpose of improvements is to preserve the existing bridge. The rehabilitation includes construction of a new bridge over the existing with stone facing on the bridge and parapets and the walls. The roadway on each side has been improved and the drainage is upgraded to handle the surface runoff.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Other |
Project Manager: | Tracy Wu![]() |
Estimated Total Contract Cost: | $718,595.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|