MILLIS- BRIDGE REHABILITATION, BR# M-23-014 ORCHARD STREET OVER BOGASTOW BROOK
The Orchard Street Bridge over Bogastow River is a historical stone arch. The purpose of improvements is to preserve the existing bridge. The rehabilitation includes construction of a new bridge over the existing with stone facing on the bridge and parapets and the walls. The roadway on each side has been improved and the drainage is upgraded to handle the surface runoff.
Location:
  • Town of Millis
  • Design Responsibility: Municipality
    Right of Way Responsibility: Other
    Project Manager: Tracy Wu
    Estimated Total Contract Cost: $718,595.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project