Project Description:
SPRINGFIELD- BRIDGE PRESERVATION, S-24-068, LIBERTY STREET OVER ROUTE I-291 AND S-24-069, ARMORY STREET OVER ROUTE I-291
The proposed work consists of repairing the concrete bridge decks; replacing the sidewalks and safety walks; installing replacement lighting, new steel bridge rail and safety screening; minor widening of the approaches; full cleaning and painting of the structural steel beams on each bridge, and installing new asphalt pavement. Construction will be staged so that one lane of travel will be maintained at all times over each bridge.
Location:
  • City of Springfield
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Hemendra Bhatt
    Estimated Total Contract Cost: $5,234,611.50
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • S24068 
    • S24069 
    See the Milestone Details tab for additional Project information