Project Description: |
LEE- BRIDGE REPLACEMENT, BR# L-05-019 GOLDEN HILL ROAD OVER THE HOUSATONIC RIVER (TUTTLE BRIDGE)
The existing bridge will be replaced by a single span steel truss bridge with a reinforced concrete deck slab. The approach roadway will also be improved.
|
Location: |
|
Resident Engineer: | Michael Fabiano Jr |
Construction Contract Value: | $1,339,699.56 |
Construction Bid Price: | $1,179,483.11 |
Initial Construction Estimate: | $1,157,525.00 |
District: | District 1 |
Current Status: | Project is complete. (as of 03/01/2005) |
|