Project Description:
LEE- BRIDGE REPLACEMENT, BR# L-05-019 GOLDEN HILL ROAD OVER THE HOUSATONIC RIVER (TUTTLE BRIDGE)
The existing bridge will be replaced by a single span steel truss bridge with a reinforced concrete deck slab. The approach roadway will also be improved.
Location:
  • Town of Lee
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Gautam Sen
    Estimated Total Contract Cost: $1,339,699.56
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • L05019 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project