| Project Description: |
LEE- BRIDGE REPLACEMENT, BR# L-05-019 GOLDEN HILL ROAD OVER THE HOUSATONIC RIVER (TUTTLE BRIDGE)
The existing bridge will be replaced by a single span steel truss bridge with a reinforced concrete deck slab. The approach roadway will also be improved.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Gautam Sen![]() |
| Estimated Total Contract Cost: | $1,339,699.56 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||