TYRINGHAM- BRIDGE REPLACEMENT, BR# T-10-004 BREAKNECK ROAD OVER HOP BROOK
This project will result in the replacement of the locally owned and structurally deficient Breakneck Road Bridge over Hop Brook in the Town of Tyringham, Massachusetts. The work includes but is not limited to: demolition of the existing bridge and replacement with a new, twin-box culvert. Other work includes: reconstruction of the roadways approaching the bridge, drainage, pavement markings, seed and loam, erosion controls, and other incidental work items. The work will require closing the bridge for about one year with traffic being detoured to nearby streets.
Location:
  • Town of Tyringham
  • Resident Engineer: Joseph Mastroianni
    Construction Contract Value: $436,599.00
    Construction Bid Price: $356,613.07
    Initial Construction Estimate: $339,484.00
    District: District 1
    Current Status: Project is completed. (as of 11/18/2004)
    Additional Info: (as of 06/21/2004)

    Contracts (1) Progress
    # 34006 -- Construction Contract
    Bridge Replacement T-10-4 (Concrete) - Breakneck Road over Hop Brook. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 09/10/2003
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Project is completed.
    Additional Info
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 10/10/2000
    Project Review Committee PRC Approved 12/19/2000
    Project Review Committee Letter 02/09/2001
    Project Status Advertised 05/17/2003